Laserfiche WebLink
Excavation, unclassified <br />• stripping, borrow areas 1,500 C.Y. <br /> Excavation, unclassified in <br /> borrow & transport to damsite 46,000 C.Y. <br /> Excavation, unclassified <br /> of enlarged spillway 28,500 C.Y. <br /> Filter Blanket 4,000 C.Y. <br /> Base Course Under <br /> Rip Rap 3,500 C.Y. <br />• <br /> Rip Rap, Type B 8,500 C.Y. <br /> Compacted Backfill 46,000 C.Y. <br /> Movement Monuments 3 Ea. <br /> Access Road (Forest Service) 1 L.S. <br /> 12" Corrugated Metal Pipe 220 L. F. <br /> Mortar Lining Existing <br /> Outlet Pipe 430 L. F. <br /> <br /> Hydraulic Outlet Control Valve 1 L.S. <br />$ 1.00 $ 1,500.00 <br />$ 2.50 $115,000.00 ' <br />$ 2.00 $ 57,000.00 <br />$ 18.00 $ 72,000.00 <br />$ 12.00 $ 42,000.00 <br />$ 15.00 $127,500.00 <br />$ 1.00 $ 46,000.00 <br />$ 500.00 $ 1,500.00 <br />$10,000.00 $ 10,000.00 <br />$ 50.00 $ 11,000.00 <br />$ 50.00 $ 21,500.00 <br />$10,000.00 $ 10,000.00 <br />