Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />• ~~~ <br />EXHIBIT E <br />Reclamation Plan <br />The anticipated past-mining land use will be rangeland. At the <br />completion of mining all slopes will be graded to no steeper than 4:1 <br />and contoured to reflect the natural terrain of the area. Final grading <br />will be approved by the Materials Engineer prior to topsoiling of the <br />area. <br />Topsoil will be replaced in an even manner over the mined area to <br />a depth of 6-12", During previous mining (prior to 1973) in the area <br />marked as "old pit" on the map, topsoil was not- saved for reclamation <br />use. Therefore sufficient topsoil may not exist to cover all of the <br />• "old pit" area, <br />The following fertilization, seeding, and mulching specifications <br />will be used in reclamation of the affected area. <br />Rec~art~atiou will occur subsequent to the completion of mining <br />operations for the proposed construction project. Less than 10 days will <br />be required for grading, topsoiling, and fertilization, seeding, and <br />mulching of disturbed areas. <br />• <br />