Laserfiche WebLink
52.05 APPLICATION FOR PERMIT FOR SURFACE OR DNDERGRODND MINING ACTIVITIES -- <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />2,05.6 Mitiga[ion of Surface Coal Mining Operation Impacts. CCont'd.) <br />(6) (f) (ii) (C) (III) CWI does not propose reloca- <br />tion of pipelines, utility <br />lines, or other features <br />(refer to Section 2.05.6(6)- <br />- (f)). <br />(IV) CWI does not propose reloca- <br />tion of moveable improvements <br />to sites outside the angle of <br />draw (refer to Section 2.05.6- <br />(6)(6Of)). <br />(V) A monitoring program designed <br />to determine the commencement <br />and degree of subsidence so <br />that appropriate measures can <br />be taken to prevent and reduce <br />material damage is presented <br />in Section 2.05.6(6)(C). <br />(iii) A detailed description of mitigation measures <br />which would be implemented to prevent material <br />damage or prevent the lessening of value or <br />diminution of the reasonable foreseeable use <br />of permit area is located in the Subsidence <br />Repair Handbook, Volume 3. <br />(A) Restoration or rehabilitation of struc- <br />tures to their pre-mining condition are <br />economically and technologically feasi- <br />ble. The changes to post mining land <br />surface contours as described by Geo- <br />Hydro Consulting, Inc. (Volume 3) are <br />insignificant to the extent that resto- <br />ration to pre-mining conditions are un- <br />necessary. <br />(b) Structures identified within the permit <br />area are not expected to become de- <br />stroyed as a result of subsidence (re- <br />fer to Section 2.05.6(6)(f)) and CWI <br />does not propose replacement of any <br />structures. <br />Added 12/26/84 <br />Revised 12/26/84 <br />Revised 10/01/87 <br />162 <br />