Laserfiche WebLink
For Culvert TA - 2 <br />According to the Weighted Q Method on the Areas listed <br /> Acres cfs <br />Disturbed Area 6 1.4 1.5 <br />Disturbed Area 9 0.4 0.5 <br />Disturbed Area 11 0.7 0.8 <br />Undisturbed Area 24 1_7 0.0 <br />TOTAL 4.2 <br />Weighted Q = ~ = 0.7 cfs <br />cfs x acres <br />2.1 <br />0.2 <br />0.56 <br />0 <br />2.66 <br />By channeling 0.7 cfs for the Weighted "Q" Areas and Dist bed <br />Areas 7. 8, 8 l0 and Undisturbed Areas 23,25, & 26 to culvert TA-2 <br />the following "Q" for the area is found by tag time (Hrs) _ <br />0.00014 (HL) (SC -0.5) <br /> Channel Lag Actual <br /> Peak Distance Slope Time Lag <br /> cfs HL ft Sc % Hrs cfs <br />Disturbed Area 7 1.7 1885 9 0.088 1.5 <br />Disturbed Area 8 1.3 1195 8 0.059 1.2 <br />Weighted "Q" Area 0.7 1160 17 0.039 0.7 <br />Undisturbed Area 25 0 995 18 0 <br />Undisturbed Area 23 0 1430 9 0 <br />Undisturbed Area 26 0 425 8 0 <br />Disturbed Area 10 1.2 160 9 0.007 1_2 <br />TOTAL 4.6 <br />• <br />• <br /> <br />