Laserfiche WebLink
the location of pennanent Sediment Pond C, and descnbe how the highwall mine benches as well as waste <br />rock pile benches and outslopes will be re-vegetated. <br />6.4.8 EXHIBIT H -Wildlife Information <br />Gregg Squire -Attached are review comments from Gregg Squire of the Division. Please address. <br />6.4.12 EXHIBIT L -Reclamation Costs <br />Drilling & Blasting -Allen Sorenson of the Division will provide review comments pertaining to the <br />specific information needed to develop an itemized cost for drilling and blasting required to achieve the <br />desired slope configuration at the time of maximum disturbance. Mr. Sorenson's continents will be <br />forwazded to the applicant as soon as they become available. <br />Revised Estimate - in conformance with Rule 6.4.12(1), please revise the reclamation cost estimate to <br />include the following itemiud costs: <br />backfilling & grading of quarry, shot rock at the time of maximum disturbance <br />backfilling & grading of overburden materials at the time of maximum distwbance <br />construction & installation of all drainage diversion channels <br />construction & installation of all main access road drainage controls, including culvert & outlet <br />bacl~ill & grading and removal of outlet control structures for all sediment ponds <br />fmish grading of quarry floor, plant/processing azea, waste rock storage area <br />importation of topsoil &Jor soil amendments from offsite <br />re•vegetation of disturbed acreage with grassrforb seed mix <br />purchase and installation of trees & shrubs <br />6.4.13 EXHIBIT M -Other Permits and Licenses <br />Gllpin County SUR -Gilpin County, in a letter dated December 2, 2004, and the City of Black Hawk in <br />comments dated December 30, 2004 have objected to the IvI1vIRR Quarry 112 Permit application for <br />- - ' "severat-reasons, otie~afwhtch-is that th~appliean[~has fatted ro~birrpiy wtiffGtrpin County's SpceiaCUse <br />Review (SUR) process. Please respond and note that any changes in the mining and reclamation plans <br />brought about by the SUR process may need to be incorporated into the DMG Regular 112 Application. <br />CDOT Highway Access Permit -The City of Black Hawk has indicated that the applicant is not in <br />compliance with applicable local permits, licenses, and approvals as the applicant does not have a <br />Colorado Departrnent of Transportation (CDOT) state highway access permit in order to access the subject <br />property and conduct their nriniug operation. Please seethe attached City of Black Hawk objection letter <br />received by the Division on December 30, 2004. Please respond. <br />6.4.19 EXHIBIT S -Permanent Man-made Structures <br />3 Structures -The applicant has indicated on page 34, Exhibit S, that there are no petmanent rnan-made <br />structures within 200 feet of the proposed mining area, but that there are three (3) structwes within 200 <br />feet of the main access road. 1Lese structures aze as follows: 1) State Highway 119 and Street Lights <br />