|
Access Permit
<br />• Attachment to Permit No. 105070 -Additional Terms and Conditions
<br />CDOT Right-of-Way:
<br />A. Written clearances for Threatened or Endangered Species.
<br />B. Wetlands clearances.
<br />C. Aichaeologica] and Paleontological clearances. Any discoveries shall be mi igated in conformance with
<br />section 107.23 of the standard specifications for road and bridge construction, 1 test edition. A surface survey
<br />must be performed and a written clearance provided to the Department and/or i ing authority prior to
<br />commencement of any construction.
<br />his the responsibility of the Permittee to assure that no such sites are present p or to commencement of
<br />construction activities. All identified sites shall be mitigated to the satisfaction f the appropriate agency prior
<br />to proceeding with work activities.
<br />Wetland mitigation shall be completed in conformance with the policies, proce res and regulations of the
<br />Anny Corps of Engineers, Federal Highway Administration and the State of Co otado, as may be applicable.
<br />12. All costs associated with the installation of this access are the responsibility of a Permittee, This includes
<br />the design, wnshuction, utility relocations, testing of materials, and inspections
<br />13. Any work within CDOT Right-of-Way shall begin after 8:30 am and all work a d equipment shall be off the
<br />highway BEFORE 3:30 pm Monday thru Thursday and L2:00 Noon on Friday.
<br />14. No work within the roadway and the State Highway Right-of--Way is allowed at fight, on Saturdays, Sundays,
<br />on holidays, during adverse weather conditions, or between November first and pril fifteenth of each year
<br />without prior approval from the Department.
<br />15. A FULLY EXECUTED COMPLETE COPY OF THIS PERMIT MUST BE O THE JOB STfE WITH THE
<br />CONTRACTOR AT ALL TIMES DURING THE CONSTRUCTION, FAILU TO COMPLY WTFH THIS
<br />OR ANY OTHER CONSTRUCTION REQUIREMENTS MAY RESULT IN T IMMEDIATE
<br />SUSPENSION OF WORK BY ORDER OF THE DEPARTMENT INSPECTO OR THE ISSUING
<br />AUTHORITY,
<br />16. The State requires a Certificate of Insurance prior to commencing any work on t e highway right-of--way. All
<br />vendors, contractors, and utility companies shall procure, at their own expense, nd maintain for the duration
<br />of the work period, the following minimum insurance coverage:
<br />A. Standard workman's compensation and employer's liability, including occup tional disease, covering all
<br />employees engaged in performance of the work at the site, in the amounts requi d by State Statues.
<br />Employer's Liability Insurance at a minimum of $500,000 each accident and $5 0,0011 each disease.
<br />B. Comprehensive General Liability at a minimum of $1,000,000 Each Occurre ce; $1,000,000 Personal
<br />Injury; $2,OOD,000 Products/Completed Operations; $2,000,000 Genera] Aggre te. CDOT will be endorsed
<br />as an Additional Insured by the contractor and all subcontractors. Completed O erations coverage will be
<br />provided for a minimum period of two years following the conditional acceptan a of work.
<br />C. Commercial Automobile Liability will cover all owned, non-owned, and hi vehicles with a minimum of
<br />$1,000,000 combined single limit bodily injury and property damage. The polic will protect CDOT es an
<br />Additional Insured and be written on an Occurrence form.
<br />D. Professional Liability Instsance. The contractor will ensure that all subcon clots procure and maintain s
<br />minimum of $1,000,000 Bach Occurenee and $1,000,000 Annual Aggregate.
<br />E. Umbrella or Excess Liability at a minimum of $1,000,000. The policy will main a clause stating that it
<br />takes effect (drops down) ih the event dre primary limits are impaired or exhaus d. The policy will be written
<br />_ on an Occurrence form.
<br />I7. Al] materials, equipment, installation, construction and design, including the auriillary lane (s) and intersection
<br />
|