My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47220
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:16 PM
Creation date
11/20/2007 1:05:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
2/17/2006
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
grease content and/or other parameters that may be required by the NPDES Permit. TCC <br />will measure the quantity and quality of any discharge from the permit area in compliance <br />with the NPDES Permit. <br />The NPDES Permit requires the prepazation and implementation of a Stormwater <br />Management Plan. Such a plan has been developed and implemented and a copy of the plan <br />has been submitted to the Division. The main purpose of the plan is to assure that run-off <br />from areas not subject to effluent limitations is subject to alternative sediment control. The <br />alternative sediment control features assure run-off from the site does not contain excessive <br />amounts of sediment or coal fines. <br />The NPDES Permit also requires the preparation of a spill prevention control and <br />countermeasure plan. The plan has been developed and implemented. The main purpose of <br />this plan is to assure that oil or other hazardous materials are not discharged into State <br />waters. The plan includes the requirement to provide containment for al] oil spill sources on <br />the property. A copy of the plan is available far review at the mine office. <br />Representative surface water monitoring has been performed at SAE sampling points as <br />shown on Map 14. This monitoring is required to confirm that surface run-off from Small <br />Area Exemption No. 1 meets applicable effluent limitations for downstream receiving <br />waters. See Exhibit 9 for further discussion regarding this monitoring. <br />Following the cessation of the loadout facilities, TCC will continue to monitor the surface <br />water flow and quality until determined that reclamation of the area has met the requirements <br />such that control of surface run-off is no longer required. Structures and other devices <br />necessary to control the quality and quantity of surface water discharge will be removed <br />when no longer needed at the loadout site. <br />2.05 - 25 <br />Rev. July 2005 <br />TR-9 <br />/j PPRoVED <br />$/260.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.