My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47209
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:16 PM
Creation date
11/20/2007 1:05:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
4.8 Performance Bond
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />I • <br />1. Assumption <br />• Reclamation Required for each year was calculated assuming that the mine <br />ceased to operate at the end of each year during the permit term (i.e., 6 months <br />behind in reclamation work). <br />2. `Iethod <br />• Reclamation needs were determined from maps when applicable. <br />• Removal of Facilities was estimated on a structural basis. <br />• Pond grading is included in Facility grading. <br />B. CALCULATIONS BY RECLAMATION CATEGORY <br />This section is divided by reclamation category, each division entailing three parts: <br />Site Specific Details Unit Cost Cost by Year <br /> <br />1. F7NA7. PIT I:RAT)iNG <br />Site Specific Details <br />• Depth of final pits averages 60 feet with an average width of 100 feet at coal elevation. <br />• Final pit requires an average 300 foot push with a D-9-L dozer with a U-blade. <br />• Backfill Volume = 200 yds of materiaUfoot of pit length. <br />ni . ('.ost. <br />a. Production Rate <br />Ideal production = 580 yds3/hr. <br />Production Factor <br />operator ........... .75 <br />material ...........80 <br />job efficiency .......83 <br />altitude ........... ,~ <br />total ............ 0.458 <br />Adjusted Production =Idea] Production x Production Factor <br />= 580 yds3/hr x 0.456 <br />= 266 yds3lhr. <br />Actual Production Rate =Volume Moved/Area + Adjusted Production Rate <br />= 200 yds3 of materiaUfoot of pit length +266 ydss/hr <br />0.75 hrs/foot of pit length. <br />b. Hourly EquipmentlLabor Costs <br />December 22, 1991 <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.