Laserfiche WebLink
i. <br />TOTAL RECLAbATION LIABILITY <br />RECLAFII~TION CATEGORY Units Coat/unit Sub-Total Totals Grand totals <br />Final Pit Area Grading <br />Moffat 3600 ft $ 123 .78 $445,608 <br />West Ridge 1135 ft $ 123 .78 $140,990 <br />Subtotal $ 586,098 <br />Spoil Grading <br />Moffat 29.79 ac $1,894 .26 $ 46,959 <br />West Ridqe 2.79 ac $1,894 .26 $ 5,285 <br />Subtotal $ 52,249 <br />Final Grading <br />Moffat 99.17 ac $1,650 .94 5163,674 <br />West Ridge 16.6 ac $1,650 .44 $ 27,397 <br />Center Ridge 15.6 ac $1, fi50 .44 $ 25,747 <br />Subtotal $ 216,818 <br />Drainage Featablisbment <br />Moffat 5149,575 <br />West Ai dge $372,565 <br />Subtotal $ 517,140 <br />Removal of Facilities <br />Silo $138,676 <br />Hel tline $197,590 <br />Coal Under Bel tl ine $ 69,641 <br />Shop/Office/Misc $337,487 <br />Loadout/Tipple $331,811 <br />Culverts $ fi,826 <br />Coal Inventory $ 63,634 <br />Coal Storage Area $ 23,694 <br />Subtotal $1 ,164,259 <br />Removal of Powerlines $ 69,719 <br />Subtotal S 69,719 <br />Sediment Pond Removal <br />Moffat Pond $ 9,961 <br />Facilities Pond $ 46,885 <br />Tipple Ponds $ 733 <br />Moffat Collection Ditches $ 369 <br />West Ridge Pond $ 23,400 <br />Center Ridge Pond $ 26,906 <br />Subtotal $ 108,254 <br />Facility, Road and Stockpile Grading <br />Explosives Storage Area $158,855 <br />Other areas $ 93,881 <br />Subtotal $ 252,736 <br />Topsoil Replacement <br />Moffat 150.5 ac $2,242. 50 $337,996 <br />West Ridge 77.8 ac $1,993. 20 $112,281 <br />Tipple Area 13.6 ac $ 488. 97 $ 6,693 <br />Subtotal $ 456,920 <br />Revegetation <br />Moffat <br />Fertilizer 150.5 ac $ 46. 03 S 6,928 <br />Contour Furrows 150.5 ac $ 29. 42 $ 9,928 <br />Permanent Mix 342.5 ac $ 208. 13 S 71,285 <br />Woody Stems 392.5 ac $1,392. 00 $976,760 <br />Reseeding 150.5 ac $ 208. 13 $ 31,329 <br />West Ridqe <br />Fertilizer 180 ac $ 96. 03 $ 8,654 <br />Cover Crop 188 ac $ 79. 23 $ 13,955 <br />MR-35 <br />9.8-2 <br />August 14, 1997 <br />