i.
<br />TOTAL RECLAbATION LIABILITY
<br />RECLAFII~TION CATEGORY Units Coat/unit Sub-Total Totals Grand totals
<br />Final Pit Area Grading
<br />Moffat 3600 ft $ 123 .78 $445,608
<br />West Ridge 1135 ft $ 123 .78 $140,990
<br />Subtotal $ 586,098
<br />Spoil Grading
<br />Moffat 29.79 ac $1,894 .26 $ 46,959
<br />West Ridqe 2.79 ac $1,894 .26 $ 5,285
<br />Subtotal $ 52,249
<br />Final Grading
<br />Moffat 99.17 ac $1,650 .94 5163,674
<br />West Ridge 16.6 ac $1,650 .44 $ 27,397
<br />Center Ridge 15.6 ac $1, fi50 .44 $ 25,747
<br />Subtotal $ 216,818
<br />Drainage Featablisbment
<br />Moffat 5149,575
<br />West Ai dge $372,565
<br />Subtotal $ 517,140
<br />Removal of Facilities
<br />Silo $138,676
<br />Hel tline $197,590
<br />Coal Under Bel tl ine $ 69,641
<br />Shop/Office/Misc $337,487
<br />Loadout/Tipple $331,811
<br />Culverts $ fi,826
<br />Coal Inventory $ 63,634
<br />Coal Storage Area $ 23,694
<br />Subtotal $1 ,164,259
<br />Removal of Powerlines $ 69,719
<br />Subtotal S 69,719
<br />Sediment Pond Removal
<br />Moffat Pond $ 9,961
<br />Facilities Pond $ 46,885
<br />Tipple Ponds $ 733
<br />Moffat Collection Ditches $ 369
<br />West Ridge Pond $ 23,400
<br />Center Ridge Pond $ 26,906
<br />Subtotal $ 108,254
<br />Facility, Road and Stockpile Grading
<br />Explosives Storage Area $158,855
<br />Other areas $ 93,881
<br />Subtotal $ 252,736
<br />Topsoil Replacement
<br />Moffat 150.5 ac $2,242. 50 $337,996
<br />West Ridge 77.8 ac $1,993. 20 $112,281
<br />Tipple Area 13.6 ac $ 488. 97 $ 6,693
<br />Subtotal $ 456,920
<br />Revegetation
<br />Moffat
<br />Fertilizer 150.5 ac $ 46. 03 S 6,928
<br />Contour Furrows 150.5 ac $ 29. 42 $ 9,928
<br />Permanent Mix 342.5 ac $ 208. 13 S 71,285
<br />Woody Stems 392.5 ac $1,392. 00 $976,760
<br />Reseeding 150.5 ac $ 208. 13 $ 31,329
<br />West Ridqe
<br />Fertilizer 180 ac $ 96. 03 $ 8,654
<br />Cover Crop 188 ac $ 79. 23 $ 13,955
<br />MR-35
<br />9.8-2
<br />August 14, 1997
<br />
|