Laserfiche WebLink
<br />TABLE 1 <br />EDNA h1INE <br />J SUMMARY OF ESTI;`IATED LIABILITY COSTS 1992-1996 <br />Reclamation Cateeorv <br />YEAR 1 YEAR 2 YI~B~ YEAR 4 ~ <br />1. Regrading of Final Pits $937,210 $430,014 $388,667 $391,423 <br />2. Rough Grading of Spoil Areas $221,500 $16,077 $14,290 $14,290 <br />3. Facility/Road/Stockpile Gradin g $175,069 $167,954 $165,971 $169,989 <br />4. Final Grading $31,401 $22,245 $20,888 $20,888 <br />5. Topsoil Replacement $692,204 $505,710 $471,183 $471,183 <br />6. Revegetation $534,1376 $489,389 $444,983 $439,526 <br />7. Sediment Pond Removal $165,801 $165,801 $165,801 $165,801 <br />8. Facility Removal $864,595 $864,595 $864,595 $864,595 <br />9. Powerline Removal $14,879 $14,879 $14,879 $14,879 <br />10. W. Ridge Hydrologic Const. $372.565 2 2 2 ~ 3q ^149.026 <br />SUB TOTAL $4,009,361 $2,974,716 $2,782,636 $2,701,600 <br />Con tiegncies. Prof. Services. Memt. Costs <br />A. Mobilization & Demobilization <br /> (10%a of Items 1-10) $400,936 $297,472 $278,264 $270,160 <br />B. Contingencies <br /> (10% of Items 1-10) $400,936 $297,472 $218,264 $270,160 <br />C. Hard Costs <br /> (Summation of Items 1-10, A, B) $4,811,233 $3,569,659 $3,339,164 $3,241,920 <br />D. Engineering Costs <br /> (10% of Item C) ~ $481,123 $356,966 $333,916 $324,192 <br />E. Reclamation Mgmt. & Admin. <br /> (5.1% of Item C) $245,373 $182,053 $170,297 $165,338 <br />F. Profit & Overhead <br /> (18.5% of Item C) $890,078 $660,387 $617,745 $599,755 <br />TOTAL LIABILITY ESTIMATE FOR BONDING PURPOSES <br />$413,475 <br />$16,077 <br />$171,007 <br />$21,227 <br />$479,815 <br />$446,876 <br />$165,501 <br />$864,595 <br />$14,879 <br />S74.513 <br />$2,668,265 <br />$266,827 <br />$266,827 <br />$3,201,918 <br />$320,192 <br />$163,298 <br />$592,355 <br />(Summation of Items C-F) $6,427,808 $4,769,065 $4,461,122 $4,331,205 $4,277,762 <br />III. DETERMINATION OF RECLAMATION COST PER YEAR <br />As shown in Table 1 for each of the five years in the 1992-1996 permit term, the estimated liability <br />bond amount is based upon the costs resulting from 10 categories of required reclamation (rows 1- <br />2 <br />December 12, 1991 <br />