Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br /> <br />• <br />• <br />3. MW-95-02 -Located in the Wilson Creek alluvium, this site represents the downgradient <br />conditions below Lower Wilson and the proposed haul road. <br />It is reasonable to expect potential future monitoring activities for the Lower Wilson locations to minor <br />those for the existing operation as it pertains to frequency and specific pazameters. <br />After mining, two additional piezometers will be installed into the toes of East Taylor Fill and West <br />Taylor Fill as described in Exhibit 21 Item 1. These piezometers will be added to the monitoring <br />program. <br />4.05.14-4.05.18 Various Topics <br />These sections are addressed in the original permit and will not change with addition of the South <br />Taylor/Lower Wilson permit revision. <br />4.06 TOPSOIL <br />The topsoil removal, storage, and redistribution plan for the proposed disturbed area associated with the <br />Lower Wilson and South Taylor mining azeas will follow the procedures described in Section 4.06 of the <br />original permit and as described in Section 2.05.3 (5) and 2.05.4 (2) (d) of this South Taylor/Lower Wilson <br />Permit Revision document. <br />South Taylor/Lower Wilson- Rule 4, Page 19 <br />Revision Date: 4/25/07 <br />Revision No.: PR-02 <br />