Laserfiche WebLink
LIST OF EXHIBITS <br />(Contlnuedl <br />Rule No. Vol. No. Tab No. Ex hl bit No. Descri ptien <br />• 11 12 ~ 12-10 Range DSag ram/Cross Section SC-18 <br /> 11 12 12-11 Range Diagram/Cross Sec[SOn SC-26 <br /> 2.05.4 (21Ic) 11 12 12-12 Range Diagram/Cross Section WC-3 <br /> 11 12 12-13 Slope Measurement Profile, Section A-A' <br /> 11 12 12-14 Slope Measurement Profile, Section B-B' <br /> 11 12 12-15 Slope Measurement Ptofll e, Section C-C' <br /> 11 12 12-16 Slope Measurement Profile, Section D-D' <br /> 11 12 12-ES1 Slope Stability Cross Section - SwASE <br /> 11 12 12-E52 Slope Stability Cross Section - REAMS <br /> 11 12 12-ES3 Excess Spoil Disposal Site Construction <br /> Plan <br /> 11 12 12-E 54 Slope Stability Cross Section E-E' <br /> 11 12 12-ES3 Slope Stability Cross Section E-E' <br /> 11 12 12-E56 Slope Stability Cross Section F-F' <br /> 11 12 12-E57 Slope Stability Cross Section E-F' <br /> 11 12 12-W1 Slepe Stability Cross Section <br /> 2.05.4 12 13 13-1 Postmining Vegetation Map <br />• 2.05.5 12 13 13-2 Backf S111ng and Gradlnq Schedule <br /> 12 13 13-3 Reveg etation Sample Site Locations 1980 <br /> 12 13 13-4 Proposed Pe zmit Map <br /> 12 13 13-5 Seneca II Bonding <br /> 12 13 13-6 One-Half Nile Adjacent 1'egetation Study <br /> Area <br /> 12 13 13-7 Postmining Vegetation Map-Pond OOB/East <br /> Wadge Extension Area <br /> 12 13 13-5 Postmining Vegetation Map-North Wadge <br /> Deadhead Route <br /> 12 13 13-9. T1 Temporary Stocktank T-1 As-Built <br /> 12 13 13-9. T2 Temporary Stocktank T-2 As-Built <br /> 12 13 13-9. T3 Temporary Stocktank T-3 As-Built <br /> 12 13 13-9. T4 Temporary Stocktank T-4 As-Built <br /> 12 13 13-9. T5 Temporary Stocktank T-5 As-Built <br /> 12 13 13-9. T6 Temporary Stocktank T-6 As-Built <br />• Revised 08/19/96 <br />