Laserfiche WebLink
LIST OF EXHIBITS <br />(COntlnuedl <br />Ne.~ Vol. Ne. Tab Ne. Exhl bit Ne. <br /> <br />• 6 <br />6 <br />6 <br />6 <br /> <br /> <br />6 <br />6 7 <br />7 <br />7 <br />7 <br /> <br /> <br />7 <br />7 7-3 <br />7-4 <br />7-6 <br />7-6 <br /> <br /> <br />7-7 <br />7-15 Regional Dzalnage Basin Map <br />Pr eml ni ng HYMO Model <br />HYMO Model Postmining Reach Map <br />Seneca II MSne Computer HYMO Routing <br />Flows for 10, 26, and 100-Year <br />Precipitation Event <br />Surface Hydrology Map <br />Surface and Ground Water Rights Plat <br />2.05.314) 6 7 7-B Wadge Impoundment Plan and Cross <br /> Section <br /> 6 7 7-BA Wadge Impoundment X002 (Proposed <br /> Postmine) <br /> 6 7 7-9 Wadge Impoundment Outlet Details <br /> 6 7 7-10 N.W. Impoundment and Diversion Ditch <br /> 6 7 7-11 Northwest Impoundment X003 <br /> 6 7 7-13A Northwest Impoundment .X OD3 IPrpposed <br /> Postmi ne) <br /> 6 7 7-12 Proposed Pond 004 <br />• 6 7 7-13 Proposed Pond 004 Details <br /> 6 7 7-14 Typical Road and DStches Details <br /> 6 7 7-16 Truck Wash Facilities Layout <br /> 6 7 7-17 Sediment Pond 008 <br /> 6 7 7-17A Sediment Pond OOB IAS Built) <br /> 6 7 7-11B Sediment Pontl Na. OOB Proposed <br /> 6 7 7-17C Sediment Pontl No. 008 As-Built <br /> 6 7 7-18 Proposed Permanent Impoundment PECOCO <br />2.04.9 7 9 9-1 Soil Types and Sample Locations <br /> (2 sheets) <br />2.05.315) 7 9 9-2 Topsoil Salvage Isopach and Stockpile <br /> Locations <br />7 9 9-3 Tepsoll Balance Plan (Life-of-Mine) <br />7 9 9-3a Topsoil Balance Plan (Current) <br />7 9 9-36 Chronological Topsoil Replacement Map <br />7 9 9-4 Postmine Topsoil and Spoil Sample <br /> Locations <br />• <br />Revised 08/19/96 <br />