Laserfiche WebLink
Agile Stone Systems, Inc, <br />• January 28, 1998 <br />Page 2 <br />• <br />communication lines or the existing track. Any construction near the communication lines and <br />existing track will be conducted by the IJPRR. <br />The second structure is the easement for the poles in the permit area noted on the maps submitted. <br />The land 30 feet around each pole will not be disturbed, if there is any excavation near the poles, <br />the area will be sloped with a 2: i slope to prevent any damage to the poles. No other activities are <br />expected to occur near the poles. <br />The engineering evaluations indicate that the proposed operation will not impact any structure <br />within 200 feet of the permit boundaries. <br />Sincerely, <br />G. VERKAIK & ASSOCIATES, INC. <br />Gerard Verkaik, President <br />GV/ed <br />i <br />