Laserfiche WebLink
~ • <br />1[r. S. Johnson <br />Page 2 <br />Ri:CLAMATIUN PLAN r <br />1. You should provide an affirmative elatameat that Southway, dba <br />Asphalt Grsvel Products, Inc., will follow Soil Conservaton <br />Service (SCS) recommendations. <br />2. Yellow Sweat Clover rates should ba changed to one pound per acre. <br />3. 41111 the area be hand watered as recommended by the SCSY <br />G. Will Rabbit Brush traaaplanting be attempted? It is staff opinion <br />Chat this is a recomnaadad procedure. <br />5. Tae SCS report indicates that reclamation won't occur for several <br />years. With this in mind, stabilization of the topsoil atock- <br />pi p=le vith an annual grass at six pounds per acre, broadcast, should <br />be undertaken. <br />If you require any assistance in repponding to this letter, please <br />don't hesitate to get in touch with me. <br />Sincerely, <br />,fade K. Orgill <br />;;eclamation S,ecialist <br />8110: av <br />