Laserfiche WebLink
<br />PART I <br />Page 3 of 14 <br />Permit No: CO-0036781 <br />• A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Continued) <br />2. Monitoring Requirements <br />In order Co obtain an indication of the probable compliance or <br />noncompliance with the effluent limitations specified in Part I, <br />the permit[ee shall monitor and report all effluent parameters <br />at the following required frequencies. <br />Effluent Parameter Measurement Frequency d/e/ Sample Type f/ <br />Flow (MGD) Weekly Instantaneous or <br />Continuous <br />pH (s. u.) Weekly Grab <br />Oil v Grease (mg/1) Weekly Visual or Grab <br />Total Suspended Solids (mg/I) Monthly Grab <br />Total Copper (mg/1) Monthly Grab <br />Total Zinc (mg/1) Monthly Grab <br />Total Lead (mg/1) Monthly Grab <br />Total Mercury (mg/1) Monthly Grab <br />Salinity g/ Quarterly Grab <br />Self-monitoring samples taken in compliance with the monitoring requirements <br />• specified above shall be taken at the following location(s): 001, the outfall <br />from the mayday ;;2 Tunnel, yet prior to mixing with the receiving o-iater. <br />d) Monitoring is required only during periods of discharge. If "no <br />discharge" occurs, this shall be reported at the specified frequency. <br />(See Part B.) <br />e) When the measurement frequency indicated is quarterly, the samples <br />shall be collected during March, June, September, and December if <br />a continual discharge occurs. If the discharge is intermi[tant, then <br />samples shall be collected during the period that discharge occurs. <br />f) See definitions, Part B. <br />a) Salinity shall be sampled monthly for six months, then on a quarterly <br />basis. Salinity may be measured either as Total Dissolved Solids (TDS) <br />or electrical conductivity where a satisfactory correlation with TDS <br />has been established (based cn a minimum of five samples). Once <br />six months of salinity data have been submitted to the Division, a <br />determination of a waiver based on salt-loading shall be made. If a <br />waiver is not granted on the basis of salt-loading, [hen [he permittee <br />shall submit a report in accordance with 3.10.41 of the "Regulations <br />for Implementation of [he Colorado River Salinity Standards through <br />the FIPDES program." This report ::ill Se due on December 31, 1981. <br />• <br />