Laserfiche WebLink
<br />substantially from our estimates. Furthermore, the cost of each well is anticipated to <br />vary widely depending on topographical and geological features at the well site, its <br />location and drilling sequence within the training panel, and its specific suitability for <br />reuse of infrastructure and equipment. <br />Notwithstanding the above, the estimated average cost of a fully developed solution <br />mining well, including well pad preparation, drilling, materials, supporting <br />infrastructure (surface piping), closure, and well pad reclamation is anticipated to range <br />from $250,000 to $400,000. Accordingly, using a figure of $350,000 per well: <br />• Well Field Development (Table 4-3, initia126 wells) <br />• Well Field Development (yeazs 1 - 5, 50 new wells) <br />• Well Field Development (years 6 -10, 75 new wells) <br />• Well Field Development (years 11 -15, 75 new wells) <br />• Well Field Development (years 15 - 20, 75 new wells) <br />• Well Field Development (years 20- 25, 75 new wells) <br />• Well Field Development (years 25- 30, 74 new wells) <br />Subtotal for Well Field Development (total of 450 wells) <br />$10,777,617 <br />$17,500,000 <br />$26,250,000 <br />$26,250,000 <br />$26,250,000 <br />$26,250,000 <br />$25,900,000 <br />$159,177,617 <br />Note that wells will be retired, closed, and reclaimed at about the same rate as they aze <br />being developed, so that, after initial startup, it is anticipated that about 15 wells will be <br />in production at any time, with an additional number either in the process of being <br />developed or in closure and reclamation. <br />It should be reiterated here that, depending on the project's success in fully developing <br />this mining technology, the number of wells and the actual cost per well may be <br />substantially different from those presented here. <br />Estimated Operating Costs <br />The annual operating costs for the entire Piceance Mining Operation, including the <br />solution mining operations and the initial processing facility, aze estimated to range <br />from $6.0 to $8.0 million dollars. <br />Operating Costs and Well Field Invesrment Costs 2-2 <br />Rio Blanco County Additional Infortnanon Request <br />Piceance Muting Operatlon <br />American Soda, L.L.P. <br />