Laserfiche WebLink
<br />Church Plt/l79-4S -2- <br />April 23. 1979 - <br />,..: <br />wentioned on page 13T A:,:• <br />~~~ <br />2) If there Is a good possibility that the operation will be expanded <br />to extract the clay;: located under the Church and HcKay ditches, <br />than this land:adould be Included la the psrwit area. Including <br />the land In the psesent permit a~1~t#tleb world probably be cosier <br />than emending the permit in the •. The landfill and ditch <br />relocations should also ba i A as affected area. <br />~ - - . <br />3) Please provide plans for constructing the proposed ditch crossing. <br />b'•~a'1` Also, the design and Construction of the haul road from the <br />Stays 0 to the Stapa,l.plt should be described. <br />~. <br />~ 4) Does the 2 to 16 foil'range in overburden depth refer to all <br />~ three pit areas. or merely to the stage 0 pit? <br />5) Please describe methods and equlpwent to bs used In removing soil <br />and overburden. To what depth will topsoil be salvaged? Please <br />indicate the location of:;WPMii stockpiles on map D-1. <br />~,w;. <br />6) Please be more specific concerning those areas where topsoil <br />salvage Is anticipated. In addition to the Stage I and Stage <br />II pits, topsoil iuusC also be salvaged frow the overburden <br />stockpile and haul road areas. <br />7) The location of clay stockpiles bba~id be Indicated on the <br />map (8-1). <br />S) Is any water used for dull control? <br />9) In order to minimize the amount of watef from overland drainage <br />collected in the pit, a diversion ditch to the west of the <br />Stage 1 and Stage 11 pits should be constructed. <br />Exhibit E: <br />1) A 1:1 slope should not be left along the west wall of the pit. <br />~, To some extent, this slope Could be rodNced by piling additional <br />.,~5 ` fill materials against the sandstone at 'the bottom of the pitt <br />Has the applicant considered using the pre-1976 spoil piles as <br />a source of fill material? <br />2) Please refer to Exhibit ~ for additional comments regarding the <br />dtsireability of leaving the Fox H111s sandstone exposed.' <br />3) The "ditch-berm combination" which is to I~ ~onstaugted.along <br />the west wall of the Pit should be descHbed`in Qrester detail., <br />and Its locatlop showe oo the Exhibit F ~pr•. VIII tMre,be <br />similar strucyure In the northern pit ores? <br />~) How will overburden artsrlals.latvrned to the pit be cowpactsd <br />to ensure stabttityT •` <br />,;:.. <br />5) Please indicate which areas x111 reee Nre ~ 6" doll cavering. <br />M111 sufficient soil M available to cover those areas <br /> <br />:<=~.: <br />~..t.r .. <br />