Laserfiche WebLink
--- Cyprus Empire Corporation --- <br /> <br /> <br />* * <br />* RESULTS TO DRAINAGE TO POND 9-P6 <br />* (continued) <br /> <br />***** ************* ******** *************** ************************************** <br />* <br />* INPUT AND CALCULATED BASIN GEOMETRY <br />* * <br />* ELEV- DIS- AVG. <br />* ATION STAGE AREA CHARGE DEPTH CAPACITY <br />* (ft) (ac) (cfs) (ft) (ac-ft) <br /> <br />* 0.0 0.26 0.00 0.00 0.00 <br />* 0.3 0.26 0.00 0.25 0.07 <br />* 0.5 0.27 0.00 0.50 0.13 <br />* 0.8 0.28 0.00 0.74 0.20 <br />* 1.0 0.28 0.00 0.98 0.27 <br />* 1.3 0.29 0.00 1.23 0.34 <br />* 1.5 0.30 0.00 1.46 0.41 <br />* 1.8 0.30 0.00 1.70 0.49 <br />* 2.0 0.31 0.00 1.94 0.57 <br />* 2.3 0.31 0.00 2.17 0.64 <br />* 2.5 0.32 0.00 2.41 0.72 <br />* 2.8 0.33 0.00 2.64 0.80 <br />* ~ 3.0 0.33 0.00 2.87 0.89 <br />* 3.3 0.34 0.00 3.10 0.97 PRINCIPAL SPILLWAY #1 * <br />* 3.5 0.34 0.09 3.33 1.06 <br />* 3.6 1.07 PEAK STAGE <br />* 3.8 0.35 0.29 3.56 1.14 <br />* 4.0 0.35 0.38 3.78 1.23 <br />* 4.3 0.36 0.42 4.01 1.32 <br />* 4.5 0.36 0.47 4.24 1.41 <br />* 4.8 0.37 0.50 4.47 1.50 <br />* 5.0 0.37 0.54 4.69 1.59 EMERGENCY SPILLWAY <br />* 5.7 0.39 11.37 5.31 1.86 <br />* 5.8 0.40 14.81 5.40 1.90 <br />* 5.9 0.40 18.62 5.49 1.94 <br />* 6.0 0.40 22.79 5.57 1.98 <br />* 6.5 0.42 51.72 6.00 2.19 <br />* 7.0 0.44 89.29 6.42 2.40 <br />* 7.5 0.45 134.48 6.83 2.62 <br />* 8.0 0.47 195.66 7.24 2.85 <br />* 8.5 0.48 268.86 7.64 3.09 <br />* 9.0 0.50 360.16 8.04 3.34 <br />* * <br />* RUNOFF PEAK PEAK SEDIMENT PEAK SETTLEABLE SEDIMENT <br />* VOLUME DISCHARGE CONCENTRATION CON CENTRATION YIELD <br />* (ac-ft) (cfs) (mg/1) (ml/1) (tons) <br /> <br />* 0.202 2.492 152576.20 105.403 20.25 <br />~ <br />* T 0.194 0.135 271.38 0.110 0.06 <br /> <br />* <br />* AVERAGE SETTLEABLE CONCENTRATION: <br />* TIME OF VOLUME WEIGHTED DURI NG ARITHMETIC DURING <br />Exhibit 18 Revised 12/8/89 <br />-96- <br />