Laserfiche WebLink
Cyprus Empire Corporation <br /> <br /> <br />* * <br />* RESULTS TO DRAINAGE TO POND 9-P5 <br />* (continued) <br />* * <br />*********************************************** ******************************** <br />* * <br />* INPUT AND CALCULATED BASIN GEOMETRY <br />* * <br />* ELEV- DIS- AVG. <br />* ATZON STAGE AREA CHARGE DEPTH CAPACITY <br />* (ft) (ac) (cfs) (ft) (ac-fit) <br /> <br />* 0.0 0.03 0.00 0.00 0.00 <br />* 0.3 0.04 0.00 0.25 0.01 <br />* 0.5 0.04 0.00 0.49 0.02 <br />* 0.8 0.04 0.00 0.73 0.03 <br />* 1.0 0.04 0.00 0.96 0.04 <br />* 1.3 0.04 0.00 1.19 0.05 <br />* 1.5 0.05 0.00 1.42 0.06 <br />* 1.8 0.05 0.00 1.65 0.07 <br />* 2.0 0.05 0.00 1.87 0.08 <br />* 2.3 0.05 0.00 2.09 0.09 <br />* 2.5 0.05 0.00 2.31 0.11 <br />* 2.8 0.05 0.00 2.52 0.12 <br />* . 3.0 0.06 0.00 2.73 0.14 <br />* 3.3 0.06 0.00 2.94 0.15 <br />* 3.5 0.06 0.00 3.15 0.16 <br />* 3.8 0.06 0.00 3.36 0.18 PRINCIPAL SPILLWAY #1 <br />* 4.0 0.07 0.09 3.56 0.20 <br />* 4.3 0.07 0.29 3.76 0.21 <br />* 4.5 0.07 0.39 3.95 0.23 <br />* 4.8 0.08 0.45 4.14 0.25 <br />* 4.8 0.~5 PEAK STAGE <br />* 5.0 0.08 0.50 4.32 0.27 EMERGENCY SPILLWAY <br />* 5.7 0.09 11.90 4.79 0.33 <br />* 5.8 0.10 15.40 4.85 0.34 <br />* 5.9 0.10 19.28 4.91 0.35 <br />* 6.0 0.10 23.51 4.97 0.36 <br />* 6.5 0.11 53.12 5.26 0.41 <br />* 7.0 0.12 90.21 5.54 0.47 <br />* * <br />* RUNOFF PEAK PEAK SEDIMENT PEAK SETTLEABLE SEDIMENT <br />* VOLUME DISCHARGE CONCENTRATION CONCENTRATION YIELD <br />* (ac-ft) (cfs) (mg/1) (ml/1) (tons) <br /> <br />* IN 0.314 1.385 57740.00 35.883 14.27 <br />* OU T 0.314 0.451 3469.54 1.406 1.25 <br />* * <br />* * <br />* AVERAGE SETTLEABLE CONCENTRATION: <br />• <br />* TIME OF VOLUME WEIGHTED DURING ARITHMETIC DURING <br />* SIGNIFICANT TIME OF PEAK TZME OF PEAK <br />* CONCENTRATION SIGN. CONC. 24 HOUR SIGN. CONC. 24 HOUR <br />* (hrs) (ml/1) (ml/1) (ml/1) (ml/1) <br /> <br />Exhibit 18 Revised 12/8/ 89 <br />-83- <br />