Laserfiche WebLink
6.4.12 EXHIBIT L -Reclamation Costs <br />The permit boundary encompasses 18.4 acres of which 12 acres will be reclaimed. <br />Final reclamation will involve the re-handling of the topsoil which was stockpiled along <br />the west side of the site. The Applicant/Operator believes that 12 inches of material will <br />be available for placement during reclamation. <br />Reclamation Estimate <br />Spread & Place Topsoil/Growth Medium (19,360 CY @ $1.50) <br />Seed, Fertilize and Mulch (12 acres (a7 $200) <br />Total Estimate for Bond <br />$29,040 <br />2,400 <br />$31,440 <br />