Laserfiche WebLink
• • <br />Item <br />Removal of Structures <br />Labor <br />Equipment . <br />Earthwork <br />Excavation <br />Fill - Refuse <br />Spreading Topsoil <br />Drill Seeding <br />Mulching <br />Hydroseeding & Mulching <br />Fertilizer <br />Seed <br />Totals <br />GE% COLORADO INC. <br />RECLAMATION PLAN <br />NORTH DECLINE - SITE PLAN <br /> Un1t <br />uantit Unit Cost <br />150 Man/Hr E 17.20 <br />60 hr 29.30 <br />41.600 Cu-Yd 1.00 <br />81,500 Cu-Yd <br />8,100 Cu-Yd 1.25 <br />10 Acre 40.00 <br />10 Acre 175.00 <br /> Acre 900.00 <br /> Acre 372.00 <br />10 Acre 64.00 <br />Cost <br />S 2,580 <br />1,758 <br />41,600 <br />10,125 <br />400 <br />1,750 <br />640 <br />$ 58,853 <br />