My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46882
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:59 PM
Creation date
11/20/2007 12:57:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
5/4/2007
Section_Exhibit Name
South Taylor Permit Application
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Baseline environmental quality data including vegetation, soils, surface water, and ground water was collected, <br />evaluated, and summarized in this document. In addition, cultural and historical features, surface ownership, coal <br />ownership, wildlife, and land use was evaluated and summarized in the permit revision application. Permits for <br />.iischarge of surface water from the South Taylor mining area, air quality emissions, blasting activities, wetlands <br />disturbance and reclamation, installation and maintenance of groundwater monitoring wells, and weights and <br />measures will be obtained prior to beginning mining activities as part of this application. <br />This permit revision document is intended to only present information relevant to the expansion area and does not <br />include information regarding the existing mining area. Sections of the existing permit that present general <br />information that is applicable to the existing operation were not changed and therefore are not included in this <br />document. Please refer to the existing permit document for general information not presented in this document. <br />Colowyo has been mining for over 27 years and current evidence documents that Colowyo's mining and reclamation <br />plan, including the associated design criteria are functioning in compliance with the rules of the Colorado Division of <br />Minerals and Geology -Mined Land Reclamation Division (the Division). The extension of the mining and <br />reclamation plan into adjacent areas are anticipated to meet with a similar high degree of success. <br />The Division has been provided significant information regarding Colowyo's current operation through the initial and <br />subsequent permit applications, permit renewals, and site visits. In addition, the Division has been presented <br />information regarding the proposed permit boundary expansion area during on-site presentations, meetings, and <br />correspondence. Additional information is presented in the following permit revision application. <br />There are several items which are part of this application but will be provided under separate cover. We would <br />anticipate that these will be provided within about 2 weeks. Specifically, these items include: <br />• Exhibit 7, Item 14 <br />• • Exhibit 7, Item 14 <br />• Exhibit 7, Item 14 <br />• Exhibit 7, Item 20 <br />• Exhibit 21, Item 1 <br />Introductory text describing Sediment Pond Hydrologic Design <br />SEDCAD design information for the temporary side collector ditches and <br />the permanent ditches associated with the South Taylor Mine Plan <br />Update to summary spreadsheet showing pond design information. <br />SEDCAD model runs for the 4 new ponds <br />Geotechnical Report- South Taylor Excess Fills <br />There are also three maps which will not be submitted at this time. As we have discussed with you, these are all bond <br />related maps which can be submitted following your initial review of the proposed postmining topography. While <br />these have not been started, we would anticipate they could be completed in about 2 weeks. Specifically, these maps <br />are: <br />• Map 35A -Bond Calculation Map Worst Case Topography -South Taylor <br />• Map 36A -Bond Calculation Map Regraded Topography -South Taylor <br />• Map 40A -Bond Calculation Cross Sections -South Taylor <br />Please contact me at (970) 824-1579 with any questions that may develop during your review of the attached permit <br />revision application. <br />-~ <br />a'f y A. zzi ~=~~' <br />Senior Environmental Engineer <br />Colowyo Coal Company <br />attachment: CDMG Application Form for a Revision to a Coal Mining and Reclamation Permit <br />Cc: Central Files <br />Colowyo Mine • 5731 State Highway 13 • Meeker, Colorado 8]641 <br />T+1 970 S24 1500 • F +1 970 824 1504 • www.rtea.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.