Laserfiche WebLink
<br /> <br />BASIC RECLAMATION COSTS BROKEN DOWN AS FOLLOWS <br />A BACKFILLING: <br />1. 1957 Yd3/acre at $ .16 /Yd3 $ 233.00 /acre <br />2. Equipment to be used Loader/Dozer <br />B. LEVELING AND GRADING: <br />1. 4840 Yd2/acre at $ .04 /Yd2 $ 193.00 (acre <br />2. Equipment to be used Loader/Blade <br />C_. TOPSOILING: <br />1. 1236 Yd3/acre at $ .20 /Yd3 $ 297.00 (acre <br />2. Equipment to be used Loader/Dump truck/Blade <br />D• RESEEDING: <br />1. 50 Pounds of seed at $ 35.00 /Acre <br />2. 15 Pounds of cover crops $15.00 /Acre <br />3. Labor and Equipment costs $ 22.00 /Acre <br />4. Equipment to be used Broadcast seeder <br />E. MAINTENANCE/REAR/ACRE <br />Labor $ 29.00 <br /> <br />Tools $ 6.00 <br /> <br />Fertilizer $ 10.00 <br /> <br />TOTAL S 40.00 <br />TOTAL COST OF RECLAMATION/ACRE $ 785.00 <br />