Laserfiche WebLink
more than adequate to safely pass the runoff from a 10-year, 24-hour <br />event. <br />SEDIMENT CONTROL MEASURES <br />A sediment control plan has been designed and approved. This plan has <br />been implemented and is presently functioning to prevent additional <br />contributions of sediment to streamflow or to runoff outside the permit <br />area. The plan involves berm construction, site grading, diversion <br /> <br /> <br />23-160aR Revised - November, 1991 <br />