Laserfiche WebLink
• <br />design event is 31.1 hours. See Figure 23-27, Typical <br />Sedimentation Pond Cross-Section, for a diagram of the <br />primary spillway outlet. <br />(b) To prevent surface film (which contains coal dust) from <br />discharging and to prevent short circuiting, a 6-inch <br />trash collector/skimmer device is mounted over the riser <br />as shown in Figure 23-27, Typical Sedimentation Pond <br />Cross-Section. <br />(c) As shown on the Loadout Area Hydrology Map, (Map 19). the <br />maximum possible distance separates the inlet and outlet <br />to prevent short circuiting. <br />Emergency Spillway Design <br />Drainage area <br />• 25-year, 24-hour event <br />_ Runoff - Curve /90 <br />Peak Flow - Curve /90 <br />Flat Slope <br />Type II Storm <br />Western Colorado <br />Channel Type <br />Sfde Slopes <br />Channel Gradient <br />7.445 acres <br />2.0 inches <br />1.09 inches <br />7.6 cfs/inch runoff or <br />8.28 cfs <br />Trapezoidal <br />2:1 <br />less than lY <br />By trial and error, using U.S. Department of Transportation, 'Design <br />Charts for Open Channel Flow". the appropriate channel width to carry <br />the peak flow at less than the critical curve velocity is three (3) feet <br />with riprap bottom. <br />Channel Width 3.0 feet <br />Depth of Flow 0.78 feet <br />Yelocity of Flow 3.1 feet per second <br />Criticai Yelocity 3.8 feet per second <br />23-I66 <br />