Laserfiche WebLink
TASK 1 Building Demolition <br />STRUCTURE or ITEM <br />DESCRIPTION DIMENSIONS DEMOLITION <br />DESCRIPTION QUANTITY UNIT UNIT <br />COST TOTAL <br />COST <br /> <br />Office Trailer 24x6O'xlO' Replace tires, remove <br />interiorjoints, haul2-12' <br />ide trailers to Durango. 2 units EA 750 + <br />$2.001 <br />mile RT $1,600 <br /> <br />Portal Buildin 12k2Ok8' Demolish dum on-site 1,920 CF $0.55 $1,125 <br /> <br />Main Conveyor 0 LF Conveyor, elevated - <br />5'Wx 6'H 40 LF $30 $1,200 <br />Scale House O'x42'x10' Doze & bury at highwatl 16,800 CF $0.55 $9,240 <br />Tipple Building (Pole Barn <br />Construction-12 Steel Poles 60'x65'x1' <br />Roof Vol. .Demolish w/dozer- <br />bu at hi hwall 3,900 CF $0.55 $2,145 <br />Tipple Lean-to Shed 18'x45'x8' <br />Roof Vol. Demolish w/dozer- <br />bu on-site 6,480 CF $0.55 $3,564 <br />East Bins 15'~Q5x5O' <br />section Bins Disassemble bin, cut- <br />orch 12 uprights- bury <br />t hi hwall 64 man hrs HR $25.00 $1,600 <br />Crusher 15'x17'x40' Demolish = bury at <br />hi hwall 10,200 CF $0.55 $5,610 <br />Mine Fan x6'x30',4x6'x10 Demolish -bury at <br />highwatl 960 CF $0.55 $528 <br />8afh House O'x60'x18' Doze & bu at hi hwall 42,200 CF $0.1163 $5,023 <br />Stacker Conveyor 300 LF Conveyor- elevated- <br />5'Wx 6'H 300 LF $30 $9,000 <br />Stacker Tower #1 10'x2O'x5O' Demolish - bury at <br />hi hwall 10,000 CF $0.55 $5,500 <br />Stacker Tower #2 8'xI2'x25' Demolish - bury at <br />highwatl 2,400 CF $0.55 $1320 <br /> <br />Remove Two 500 Gallon Gas <br />Tanks 2@500 Gallons Excavate 8 load 2 EA $335 $670 <br /> <br />Burn Trash and Debris, Bury <br />On-Site ssume 150 CY Doze & bury at highwatl 150 CY $1.00 $150 <br /> <br /> <br /> <br /> <br /> <br />TOTAL $48,275 <br />