My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46795
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:55 PM
Creation date
11/20/2007 12:55:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
9/21/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix 9-2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $49.88 NA <br /> Operating cosUhour : $66.09 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $31.78 NA <br /> Total unit cost/hour : $14775 Total fleet cost/hour : $147.75 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,098 LCY factor : NA volume : 6,098 LCY <br /> <br />Source of estimated volume : 35'thick X 1. 08 acres (Map G6) <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/trc Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Loose stockpile Spoil pile : 0.80 (tnd-rQ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,475 feet Material weight : 0.78 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.47 <br />Weight description <br />Decomposed mck - 50% Rock. 50% Earth <br />J08 TIME AND COST <br />Fteet size : 1 Dozers) <br />Unit cost : $0.223 /LCY <br />Adjusted unit production <br />Adjusted fleet production <br />663.30 LCY/hr <br />663.30 Lcv/nr <br />9.19 Hours <br />Total joh time <br />Total job cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.