My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46727
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:50 PM
Creation date
11/20/2007 12:54:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
INTRODUCTION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />coal. Presently, Kerr Coal has no long-term contractual commitments <br />although ongoing coal marketing is an important priority for the mine. <br />Current production of approximately 80,000 tons of coal annually is being <br />sold on a spot contract basis. <br />Crushing and Load-Out Facilities <br />The Kerr Cal Marr Prep. Plant operation is served by a single 94 mile rail <br />branch line from Laramie, Wyoming. The crushing and load-out facilities <br />are located 10 miles west of the mine at Warden, Colorado. The Wyoming <br />Colorado Railroad is the rail carrier, and production from the Kerr Coal <br />operation represents 809e of the total coal freight volume moved by the <br />carrier from the North Park area. <br />989 of Kerr Coal's coal production is shipped by rail from the Marr Prep <br />Plant constructed along the Branch line. The plant crushes mine-run coal <br />to customer specifications at the rate of 500 tons per hour and then loads <br />• the coal into rail cars at the "unit train" rates specified in the <br />applicable tariffs covering freight rates from the mines to customers' <br />plants. The remaining 2% of production is delivered by truck. <br />Mine Development and Necessity for Permit & Mine Plan Approval <br />Recognizing the limited quantities of its fee coal reserves, Kerr Coal <br />sought additional coal reserves from the federal government as early as <br />May 1975, when the company applied for a lease. At that time, due to the <br />moratorium placed on regular coal leasing in 1971 by the Secretary of the <br />Interior, the only method for Kerr Coal to obtain federal coal was under <br />the then existing short-term criteria. Although Kerr Coal expected that <br />the federal coal adjacent to its operation would be made available under <br />the short-term criteria, this expectation was never realized due to the <br />further delay caused by NRDC v. u he . <br />Only after the effective date of the Federal Coal Management Program <br />Regulations (43.CFR Part 3400, et. sec.) on July 19, 1919, was Kerr Coal <br />• <br />-6R- Revised - August, 1990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.