Laserfiche WebLink
1 <br /> <br /> RECLAMATION TIMETABLE <br />' <br />Phase <br />Years E <br />Slopg stimated Ac <br />Floor Re res +/- <br />vQgetatio <br />n Totai <br /> 1 5 18.42 4.38 22.80 22.80 <br />' 2 5 30.32 16.98 47.30 47.30 <br /> 3 5 1.81 8.37 10.18 10.18 <br /> 4 5 6.25 9.27 5.52 15.52 <br />' 5 5 13.02 8.97 21.99 21.99 <br /> 6 5 6.13 2.00 8.13 8.13 <br /> 7 5 4.90 0.69 5.59 5.59 <br />' <br /> TOTALS 80.85 50.66 131.51 131.51 <br />t The total reclamation period of 35 years indicates <br /> individual tim es by phases. Some reclamation periods will <br />' <br /> overlap and be in progress at the same time as others. <br /> Therefore, 35 years is a ma ximum estimate. Reclamation is <br /> expected to be completed in a sho rter time. <br />1 <br />1 <br />1 <br />I' <br />i~ <br />I1 <br />1 <br /> <br />I1 <br />' 24 <br />