Laserfiche WebLink
1 <br />1 <br />1 <br /> <br /> <br />I' <br />i~ <br />i~ <br />i~ <br />ii <br />i~ <br />I1 <br />I' <br />I' <br />1 <br />1 <br />I1 <br />areas from the drainage. <br />The operator does not expect to disturb the prevailing <br />hydrological balance of the affected land nor the surrounding <br />area or the quality or quantity of water in surface and <br />groundwater systems during or after the mining operations. <br />Fugitive dust is expected from only one source--truck traffic <br />along the haul roads. Experience indicates the mining operations <br />in the pits themselves generate little, if any, dust. Water will <br />be sprayed onto the roads to control dust. <br />Mining_Timetahle. The uncertainty of current economic <br />conditions in the construction industry precludes accurate <br />forcasts of mining activity over the life of the mine. Therefore, <br />the operator has elected to estimate a mining timetable based on <br />an average year and expects a specific year to vary widely from <br />the average. <br />MINING TIMETABLE <br />Stage Years Total Acres +/- <br />1 2 22.80 <br />2 40-50 47.30 <br />3 6- 8 10.18 <br />4 20-25 15.52 <br />5 10-15 21.99 <br />6 5-10 8.13 <br />7 35-40 5.59 <br />TOTALS 131.51 <br />Mined Acres +/- <br />14.32 <br />44.53 <br />8.40 <br />11.95 <br />20.89 <br />7.44 <br />0 <br />107.53 <br />.a <br />