Laserfiche WebLink
<br />I~ material, as is being replaced on all other mine facilities. <br /> Response: The lower slope of the buttress will be topsoiled with 18 inches of <br /> topsoil material. <br /> Exhibit E, Section E.3.1.2 revised 4/20/89. <br />' 5. The buttress should be revegetated with the agreed-upon seed mixture. <br /> As the buttress outslope is primarily a north facing slope, we would <br /> suggest that consideration 6e given to planting additional trees in <br />' this area. It is thought that a good stand of trees in this area <br /> would greatly enhance the post-mining pit ecology. <br /> Response: The lower slope of the buttress will be revegetated with the approved <br /> seed mixture. Trees will also be planted at a minimun rate of 100 <br /> trees/acre. <br /> Exhibit E, Section E.3.1.2 revised 4/20/89. <br /> 6. Please include the estimated cost of constructing and reclaiming <br /> the buttress in the revised reclamation cost estimate. <br /> Response: Enclosed are the appropriate revised sections for Exh~bit L. <br /> Exhibit L revised 3/10/89 and revised again 4/20/89. <br /> <br />t <br /> <br /> <br /> <br /> <br /> <br /> <br />J <br />r <br />