Laserfiche WebLink
t <br />' Response: The test heap area will be reclaimed during the initial stages <br />of the San Luis Project as indicated in revised Section E.4.3. <br />Since reclamation costs are based on the worst case maximum <br />disturbance at the end of mining the cost of reclaiming the test <br />heap area is not included in the reclamation calculations. <br />No application change necessary. <br />96. Please include the cost of reclamation at the FSI heap, including pool <br />removal, pond grading, topsoil replacement and revegetation. <br />Response: As indicated in revised Section E.4.2, the ESI heap will be one <br />of the first areas reclaimed. Since reclamation costs are based <br />on the worst case maximum disturbance at the end of mining, the <br />costs of reclamation of the ESI heap are not included in the <br />reclamation calculations. <br />No application change necessary. <br />97. Please include the cost of reclaiming the Borrow Area, including <br />grading, topsoil replacement and re vegetation. <br />1 Response: The borrow area will be used for construction of the leach pad <br />secondary liner system. This area will be reclaimed in full after <br />completion of leach pad construction in approximately year 6 of <br />operations. Since reclamation costs are based on the worst case <br />maximum disturbance at the end of mining the costs for borrow <br />area reclamation are not. included. <br />` , No application change necessary. <br />98. Please include the cost of monitoring well abandonment. <br />Response: The cost of monitori~ig well abandonment has been added to Exhibit <br />L calculations. <br /> Exhibit L has been revised several times, most recently on 4/20/89. <br /> 99. The cast of seed should be for pounds Pure Live Seed (PLS). Please <br /> state whether the estimated costs is for pounds of seed .~r seed <br /> adjusted to pounds PLS. <br /> Response: Exhibit L seed costs have been r evised to show cost of seed <br /> adjusted to pounds PLS. <br /> Exhibit L has been revised several times, most recently on 4j20/89. <br /> <br />1 <br /> <br /> <br />