My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46670
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:48 PM
Creation date
11/20/2007 12:52:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/26/2005
Section_Exhibit Name
2.06 Permits for Special Categories
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The geotechnical analysis completed by C"fL/Thompson, Inc., concluded that the Streeter <br />Fill, as built by Colowyo meets the stability requirements of OSM regulations. <br />The fill did not, however, meet the design criteria: requirement of the OSM Interim <br />Regulations and therefore was still in violation. To resolve the issue, OSM agreed to <br />withdraw the Notice of Violation conditioned upon the agreement that Colowyo submit an <br />application for qualifying the Streeter Fill under the Experimental Practices Program referred <br />to in 30CFR, Section 785.13; see Hearing for Review of Notice of Violation No. 79-V-1-4, <br />August 7, 1979 in Exhibit 12, Experimental Practice Information. <br />Subsequent to the hearing, Colowyo filed an application for an experimental practice on <br />September 4, 1979, (see Exhibit 12, Experimental Practice Information) and receipt of the <br />application was acknowledged in a letter from Walter N. Heine, Director of OSM, on <br />September 28, 1979 (see Exhibit 12, Experimental Practice Information). <br />To date, there have been no final approvals or denials of the Experimental Application by <br />OSM or the Division. <br />In correspondence dated October 11, 1979, OSM requested the Division recommend <br />approval of the experimental practice designation for Colowyo's Streeter Fill. In a letter <br />dated February 13, 1980 the Division replied to OSM that approval of the experimental <br />practice could not be given until certain questions were resolved. A copy of the <br />correspondence from the Division, the February 6, 1980 letter from Mr. Jim Pendleton <br />• commenting on the Slope Stability Analysis of Colowyo's Streeter Fill, and the February 13, <br />1980 letter from Mr. Fred Banta to Mr. Donald Crane requesting Clarification Before <br />Approval of Colowyo's Streeter Fill is included in Exhibit 12, Experimental Practice <br />Information. On March 24, 1980, CTL/Thompson, Inc, responded to the concerns of the <br />Division (see Exhibit 12, Experimental Practice Information, March 24, 1980, letter from <br />CTL/Thompson, Inc. to OSM commenting on Questions Raised by Division Concerning <br />Colowyo's Streeter Fill). <br />C J <br />2.06-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.