Laserfiche WebLink
.. ~. <br /> <br />c. A map at a scale of 1=2400 has been provided which shows <br />the exploration activities involved, including all roads to be used or built and the <br />location of drill sites, if applicable. <br />d. Supply longitude and latitude if the area has not been surveyed. <br />3. Period of Intended Exploration: <br />Exploration site #'s PEDS-1 to PED~ro 4 (mo/yr) 10/94 to 9/9'6 <br />Exploration site #'s from (molyr) <br />to <br />Exploration site #'s from (mo/yr) to <br />All exploration activities will be completed by (molyr) 9196 <br />All reclamation activities will be completed by (mo/yr) 10/96 <br />4. a. If the surface is owned by a person other than the person who intends to explore, give <br />a description of the basis upon which the person who will explore claims the right to <br />enter such area for the purpose of conducting exploration and reclamation (attach <br />supporting documents, if applicable): Refer to attachment. <br />5. Attach a description of the land to be affected. For example: The condition of the topsoil, <br />the general hydrology, type of vegetation and topography, Rule 2.02.2(2)(c). <br />Refer to attachment. <br />6. Describe Exploration Activities; Rule 2.02.2(2)(8): Refer.to attachment. <br />a. Attach a narrative description of methods and equipment to be used to conduct coal <br />exploration activities. Include drilling operations, surface blasting, road or access route <br />construction, excavated earth and debris disposal activities. Also describe measures <br />to be taken to protect the environment: topsoil salvage, diversion of overland flow, <br />settling ponds, etc. <br />b. Specifically address: <br />1.) Location and acreage of areas where topsoil will be salvaged and stored; <br />2.) How much earth moving will be needed for new roads or drill sites, if any; <br />3.) What seed mix (type and amount) will be used for revegetation; <br />4.) Depth of drill holes; <br />5.) Whether aquifers will be encountered (include supporting references); <br />6J Precise description of how drill holes will be sealed and plugged in accordance <br />with Rule 4.07; and <br />-3- <br />