Laserfiche WebLink
<br />Eb:HIBIT B <br />Mining Ylan: <br /> <br />A. This pit is built into the side of a hill in <br />mildly rolling country. It is about 2 acres <br />in size at the present time. The excavation of <br />material has left a crescent shaped area that <br />is disturbed. Future mining will follow the <br />same pattern. <br />B. The operation consists of loading material into <br />dump trucks with a front-end loader and then <br />hauling the material to the road being worked. <br />l.. The material to be mined is sand and gravel. <br />D. There are no surface or sub-surface water <br />rights involved. There is no seepage of <br />water into the pit. <br />E. The pit will be mined down to the shale. <br />