Laserfiche WebLink
~. LOADING IN TO FMSFIED PRODUCT S7L~nPILE: <br />Method of Loading In (Front-Fnd Loader, Conveyor, etc.) <br />If Conveyor is Used, Whst is hlaeim~~ Dmp Height? Ft. <br />• j~n> Schedule: tons/hr., hrs./day, days/yesr. <br />_ __Proposed Controls <br />Controls for Load_'ne° to Stoclrpile Include: Water Sprays, Total Enclosure, <br />Partial Enclosure, Chemiical <br />• Suppressants, Reduced Drop Height, <br />Telescoping Chute, Other (specify) <br />No Control <br />B. FINISFI£D PRODUCT SIG^dPILF: <br />• <br />MatL~m• Tons Stored at One Time Tons <br />Length of Time Pile ag~°;,,a Undisturbed <br />Proposed Controls: (check appropriate boxes! <br />• <br />L/ Watering Tzmes/Day, or Continuous Sarinkler <br />(to maintain moist satiate) <br />L/ Chemical Stabilizer (Applied According to Manufacturer's Specifications! <br />•' L/ Ca~npacting of Piles, Method <br />L/ Fhclosures: Complete, or Fartial (check one! <br />L/ Revegetation, (Length of Time Ti11 Revegetation ) <br />• L/ Other (specify) <br />L/ No Control <br />• C. LOADING OUT FFK,tN STC:G7~IZE FYJR FINAL TRANSFCJRT: <br />Method of Loading Out (Front-End Loader, Conveyor, etc.) <br />If Conveyor is Used, What is Maximum Drop Height? Ft. <br />• <br />Loading Schedule: tons/hr., hrs./day, days/veer. <br />Proposed Controls <br />Controls for Final Laadout Include: Water Sprsys, Total Enclosure, <br />• Psrtial Enclosure, Moist Material, <br />Other (specify), No Control <br />page 8 <br />• <br />