Laserfiche WebLink
B. LOADING 7V 7CJ RAW MATERIAL S7T:L7iPILE: None Planned <br />~ Method of lauding in (Truck Bottom Dump, Front Ead Loader, etc.) <br />Loading Schedule: tans/hr., hrs./daS•, days/veer. <br />• ~- <br />Proposed Controls far Loading to Stockpile <br />Controls Include: Water Spray, Chemical Suppressants, full enclosure, <br />partial enclosure, Other (specify), No Control <br />• <br />C. RAW MATERS4L STTxn'PILE: None planned <br />(MATERIAL): <br />~ ~'taxvm.mt Tons Stored At Any One Time <br />Length of Time Pile aA,m,,,,s Undisturbed <br />Proposed Control: (checlr appropriate boxes} <br />~ L/ Watering times/day, ar Continuous Sprinkler <br />(to maintain moist surface} <br />L/ Chemical Stabilizer (Type } <br />L/ Enclosures: Complete, or Partial (check one) <br />• ' <br />L/ Other (specifYl ' <br />L/ No Control <br />r D. LOAD ,SYG IXlf F7~ri7 RAW MATERIAL STY~G7fPILE: None Manned-. <br />Method of Loading out (Front Fnd Loader, Conveyor, etc.) <br />~ Loading Schedule: <br />Proposed Controls <br />Controls Include: <br /> <br />~7 <br />tons/hr,, hrs./dav, davs/veer. <br />Water Spray, Chemical Suppressants, <br />Other (specify}, No control <br />page 5 <br />i <br />