Laserfiche WebLink
• <br />-3- <br /> <br />• <br />f <br /> <br />• <br />• <br /> (riverbottam) <br />10. Primary future _ Cropland(CR) X Pastureland(PU _ General AgricultureCGA) <br /> (Post-mining) Rangeland(R U _ Forestry(FR) _ Wildlife Hahitat<WL) <br /> _ <br />land use Residential(RS> Recreation(RC> Industrial/Commerciai(IC) <br /> (check one): _ Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br /> (riverbottom - no grass) <br />11. Primary resent _ Cropland(CR) X Pastureland(PL) _ General AgricultureCGA) <br /> land use _ Rangeland(RL) <br />Forestry(FR) _ Wildlife Hahitat(WL) <br /> (check one): _ <br />Residenttal(RS) Recreation(RC> Industrial/Commercial(IC) <br /> _ Developed Water Resources(WR) _ <br />12. Method of Mining: _ Quarry (QR) _ Solution (SO) <br /> 12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br /> Truck/Shovel <br />13. On Site Processing: Solution (SO) Chemical (CH) _ Thermal (TH) <br /> Wash sand with _ Heap leach (HL) _ Vat Le ach (V U <br /> water only. <br />14. Appiication Fee: <br /> the application fee for quarry mining is 52,325. <br /> The application fee for solution mining or any chemical o r thermal processing <br /> is 83,100. <br /> If none of these me thods or processes are to be included in the operation then the <br /> application fee is 81,875. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted to <br />• accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations 1n effect at the time the <br />permit is issued. <br />• <br />• <br />• <br />