My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46457
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:38 PM
Creation date
11/20/2007 12:47:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992038
IBM Index Class Name
Permit File
Doc Date
9/2/1992
Doc Name
Permit Application
From
Sand Creek Farms
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />-3- <br /> <br />• <br />f <br /> <br />• <br />• <br /> (riverbottam) <br />10. Primary future _ Cropland(CR) X Pastureland(PU _ General AgricultureCGA) <br /> (Post-mining) Rangeland(R U _ Forestry(FR) _ Wildlife Hahitat<WL) <br /> _ <br />land use Residential(RS> Recreation(RC> Industrial/Commerciai(IC) <br /> (check one): _ Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br /> (riverbottom - no grass) <br />11. Primary resent _ Cropland(CR) X Pastureland(PL) _ General AgricultureCGA) <br /> land use _ Rangeland(RL) <br />Forestry(FR) _ Wildlife Hahitat(WL) <br /> (check one): _ <br />Residenttal(RS) Recreation(RC> Industrial/Commercial(IC) <br /> _ Developed Water Resources(WR) _ <br />12. Method of Mining: _ Quarry (QR) _ Solution (SO) <br /> 12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br /> Truck/Shovel <br />13. On Site Processing: Solution (SO) Chemical (CH) _ Thermal (TH) <br /> Wash sand with _ Heap leach (HL) _ Vat Le ach (V U <br /> water only. <br />14. Appiication Fee: <br /> the application fee for quarry mining is 52,325. <br /> The application fee for solution mining or any chemical o r thermal processing <br /> is 83,100. <br /> If none of these me thods or processes are to be included in the operation then the <br /> application fee is 81,875. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted to <br />• accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations 1n effect at the time the <br />permit is issued. <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.