Laserfiche WebLink
<br />i Another alternative would be to install a Laramie-Fox Fills well. <br />Since the property is in a designated groundwater basin, the permit <br />will need the approval of the management district. Normally the <br />management districts accept the SEO criteria for allowable yield <br />from a well. The SEO maps show the top of the L-FH at the site <br />to be at elevation 467$ feet, the base at elevation 4350 feet, <br />~~ and the saturaded thiclmess to be 17$ feet of sandstone and silt- <br />stone. Using a specific yield of .15, water available to the <br />320 acres from the L-FH is <br />320 acres x .15 x 175' - 84 acre-feet per year. <br />100 years <br />~ This should be more than sufficient for the needs of the opera- <br />tion. <br />If you have any questions or need additional information, please <br />let me lmow. <br />• <br /> <br /> <br />i <br />• <br />• <br />..a.._~ <br />~ a ~~~ <br />th L. Hamilton, P.E. <br />~• <br />