Laserfiche WebLink
approval of a plan for water rights augmentation. To fulfill the requirements of the Seneca II-W <br />water rights augmentation plan, Peabody will monitor the water pumped from the water supply <br />Well GW-S2W-201TC to both Pond 006 and the mine facilities. Details of the approved plan for <br />water rights augmentation is contained in Tab 16, Protection of the Hydrologic Balance. <br />Appendix 16-1 presents a summary of the monitoring required by the Colorado State Engineer's <br />Office (Division of Natural Resources) to ensure compliance with the plan. <br />Four alluvial wells installed by the U. S. Geological Survey in 1980 have been incorporated into <br />the Current Monitoring Program to provide monitoring data from the upper Sage Creek drainage. <br />Wells A1, A3, A8, and A12 are detailed in Tables 15-2 and 15-3, and their location is shown on <br />Exhibit 7-1, Tab 7. <br />The 1991 program maintained the monitoring requirements contained in the pre-October, 1991 <br />program, although changes in the frequency oT monitoring at the sites varied slightly (see <br />Appendix 15-31. The majority of sites have their water levels monitored five times a year, or <br />semi-annually in the case of the new alluvial wells. Water quality samples continued to be <br />collected on a semiannual and triannual basis and analyzed according to the ground water <br />parameter list contained in Appendix 15-2. <br />Permit Renewal 2 (November, 1995) modified the ground water monitoring program. All <br />monitoring of Wells 150V, 15W, 7A1, and 23A was dropped. Water quality monitoring of Wells <br />180V and 18W was dropped. <br />Spoil wells will be placed in the lower sections of each mining area after that area has been <br />regraded. Specific spoil well locations will be determined in the future based on the spring <br />locations. Typically, a spoil well will be located upgradient of a spoil spring, and will be used to <br />collect water level and quality information. Spoil water quality samples will be analyzed in the <br />same manner as other spring water quality samples. <br />Current Ground Water Monitoring Program The 1998 monitoring program (Appendix 15-3A) was <br />instituted upon the approval of Permit Revision 2 111-W South Expansion, submitted 1998) The <br />details of changes made to the monitoring program may be found in the introduction to Appendix <br />15-3A. <br />Changes to the monitoring program were made as a result of Permit Revision 3 (Sage Creek/Wolf <br />Creek coal mining) submitted in 2002. Changes are detailed in a section titled "Permit Revision <br />No. 3 Changes ° in that appendix. <br />I• <br />TR-52 20 Revised 03/05 <br />