Laserfiche WebLink
a. Office of the State Engineer requirements. <br />b. Percent material compaction. <br />c. Liner material composition, percent moisture, percent fines, and testing <br />methods. <br />d. How the liner will be keyed in the bedrock. <br />e. Lift thickness and compaction methods. <br />f. Thickness and width of the finished liner. <br />g. Any geologic investigations on the liner material and substrate bedrock. <br />h. Depth of substrate bedrock scarification. <br />i. Diagrams or drawing of the liner. <br />j. Actions to be taken if the liner does not meet OSE standards. <br />k. Other information as needed to provide assurance that the liner is stable and <br />will operate as required. <br />1. Cost estimate for installing the liner. <br />3. Please note the "Seeding Plan" and Revegetation sections do not concur on some issues <br />such as mulching and fertilizing. Please clarify or adjust the two sections to be <br />consistent on revegetation approach. <br />6.3.5 EXHIBIT E - Maa <br />Mining Plan Map <br />1. Please show the details related to the dewatering trench in including such things as the <br />sump area, and pipeline to the discharge point. <br />2. Note the location of any significant, valuable, and permanent man-made structures <br />within two hundred (200) feet of the affected area. Additional structures noted from <br />aerial photography include a road along the north boundary, a possible stockpond on the <br />northeast comer, and any stmctures related to the adjacent Idaho Creek Resources mine. <br />3. Does the Idaho Creek Resources mine have a well permit and is that located within 600 <br />feet of the proposed mine? <br />4. Please show any adjacent mine sites on one of the in the maps. <br />Reclamation Plan Man <br />1. Please provide map details on the location, depth of, and drainage conveyance <br />structures to the stockpond. <br />2. What is the contour interval used for the reclaimed slopes? <br />6.3.6 EXHIBIT F -List of Other Permits and Licenses Required <br />1. Please confirm if any of the following permits will be needed. <br />a. County pemrit <br />b. Substitute Water Supply Plan <br />c. Well permit <br />