Laserfiche WebLink
BLAST VIBRATION ANALYSIS OF PROPOSED <br />MMRR QUARRY ON THE BLACK <br />HAWKICENTRAL CITY WASTEWATER <br />TREATMENT PLANT AND SILVER DOLLAR <br />METROPOLITAN DISTRICT FACILITIES <br />PREPARED FOR <br />BLACK HAWKICENTRAL CITY SANITATION <br />DISTRICT AND <br />SILVER DOLLAR METROPOLITAN DISTRICT <br />NOVEMBER 10, 2005 <br />PROJECT NO.: 1 086BCS03D <br />The technical material in this report was prepared by or under the supervision and <br />direction of the undersigned. <br />Joseph J. Bernosky, P.E. <br />Leonard Rice Engineers, Inc. <br />The following members of the Leonard Rice Engineers, Inc. staff contributed to the <br />preparation of this report: <br />Principal in Charge R. Gregory Roush, P.E. <br />Project Manager Joseph J. Bemosky, P.E. <br />Staff Engineer Katie Fendel, P.E. <br />Data Processor Roma Sundgaard <br />Hollingsworth Associates, Inc. <br />Hollingsworth Associates, lnc. contributed Appendix B, Vibration Study of the Black <br />Nawk/Central City Sanitation District Wastewater Treatment Plant and Silver Dollar <br />Metropolitan District Lighting Facility, [o this report. <br />LEONARD RICE ENGINEERS, INC. <br />2000 CLAY STREET, SUITE 300 DENVER, COLORADO 8021 1-51 1 9 <br />(303) 455-9589 FAX (303) 455-01 15 <br />