Laserfiche WebLink
,~, - <br />~. ~vo ,~ <br />~~ ~ ~ ~ <br />Exhibit A - Lesal Description S;.PP~~"v gJ(I ~u d 31a5)~~ <br />~lr~ - <br />The legal description of the proposed affectedr areas rirven to the nearest township, <br />range and quarter, quarter s,~e,9ctnio~n~is:_~ G~~G~~~~C~/O/y~. ~~~ <br />-_~~~~~~t 11_C1"L----- - ---- - - -- -- - ------- - <br />Exhibit B - Mininn_ Plan <br />1. Topsoil will be stripped Co a depth of inches and stockpiled in the <br />area shown on Exhibit G1 m;rp hclow. <br />2. If overburden is to be removed to reach the gravel deposit, --- <br />feet will be removed, segregated from the topsoil and stockpiled in the <br />area shown on Exhibit CI map below. <br />i <br />3. Gravel will be mined to a maximum depth of feet Crom the ground <br />-~~--- - <br />surface, and in the direction as shown by an arrow on Exhibit C] map belrna. <br />4. The following types of equipment will be used to mine the deposit: <br /> <br />5. The following types of fixed equipment will be used to process the gravel <br />on site: ~-'-~~Lf-~~-- <br /> <br />and will be located as shoim on Exhibit ~;I mop below. <br />6. The operation will begin on and will be <br />^(date) <br />completed by`~y~~ _ _ ___ <br />(appror.imnte date) <br />7. If ground water is to he encountered durinf; minim;, describe the proposed <br />dewaterinq and sediment-contaimnent system:_ ~ a-~T/F <br />(This system may also be shown on the Exhibit f..l. map) <br />8. As necessary, describe in detail measures which will. be taken to control <br />drainage and sediment in and around this site: ~/ D N~ <br /> <br />i982 ------ - ----- -- --- --------- <br />MINED LAND RECLAMATIO~i <br />Colo. --- ------ <br />(Diversions may also be shown on the Lxl,ibit(;I. map) <br />