Laserfiche WebLink
<br />Cxhibit D - Wi.ldlifc, IJaler Resources, Sails l'q;ct;ilion ]nfnrmation <br />1.. Contact the local Division of b'i ldlife office far a wildlife impact <br />assessment and attach their statement to this application. <br />2. Contact the local office of the Soil. Conservation Service for an an-site <br />soils and vegetation inEormaCion. Attach Ureir reporC [o [his application <br />3. lJater Resources <br />A. Flow much water will he used in conjunct inn with Chis mi.nin{; operation? <br />flhere will you acquire this water? Do you have appropriate industrial-use <br />water rights? Q ~ <br />~(IJater RighCS are required for such items as Ins[ control, processing, <br />ponding, c[c.) <br />B. If ponding is to be parC of: your reclamation plan, identify the water <br />right associated with the proposed ponds. <br />Cxhibit E - Reclamation Plan <br />The operator is encouraged to consult with their local Soil. Conservation Service <br />representative Cor on-site reclamation recommendations and review Rule 6. <br />1. ldill you be following the reclamation guidelines provided by the Divisi/on <br />of Wildlife and/or the Soils Conservation Service?__~'v_~~ S__ Co/p'- <br />~.C~-~!~J`Ldp!_-~~~"fl1_~~~----------------- <br />2, Slopes will be graded to a maximum (horizonta.l to vertical) slope of: <br />i ~ <br />3 <br />If applicable, the depth of overburden to be repla<ed will be -- <br />4. Topsoil will be replaced to a minimum depth oC - _ __ inches. <br />-- (range) <br />5. Staff recommends Chat topsoil and subsoil be di.sced to at leas[ 6" to <br />provide for b:i ndin;; nml rr~nC pr:ncl raCi.un. <br />6. 1'he site will be planCed, lace fall or early spring;? <br />:~~ ?~~i~ ~~y ~~ <br />r~tAR ~ ~ 1982 <br />MINED LAND RECLAN1ATi01V <br />Colo. Dept. of Natural Resourees <br />