Laserfiche WebLink
<br />methods be used. Also, please include the cost for subsoil and topsoil <br />transportation from the Hall Pit to Area S. <br />United Companies will follow the BLM recommendations for reclamation practices <br />at the BLM Pit #1 site. The BLM recommends that seed distribution is done with a <br />seed drill where possible. <br />Costs for transport of subsoil and topsoil from stockpiles to Block 8 can be estimated <br />by using the Reclamation Timetable for volume estimates: <br />Subsoil required from Hall Pit stockpile =total subsoil volume to reclaim Block 8, <br />the processing area and the haul road to this end of the pernrit (9035 cy) -Block 9 <br />subsoil placed at Block 8 (5969 cy) = 3066 cy. <br />Topsoil required from the Hall Pit stockpile to reclaim Block 8 (and the road and <br />processing area) is estimated by review of the Reclamation Timetable to be the total <br />amount required for reclamation of these areas, 9035 cy. <br />15. Exhibit S states that United will be providing a new fence to replace the one <br />owned by Ford Pit and United. For the file, please supply a notarized agreement <br />with the Ford Pit owners per the requirements of Rule 6.4.19(a) concerning the <br />fences. <br />A notarized agreement with Mr. Harold Ford concerning this fence is attached. <br />l6. At this time there is no information on timely public notices, County <br />Commissioners notification and filing with the County Clerk's office required in <br />Exhibits Q & R. Please supply the required notices as soon as possible. <br />The required documents were provided to the Division with each of the 5 copies of <br />the application package. I did not insert the verification documents at the proper <br />locations in the application, however. They were attached behind the signature page <br />near the front of the application. I am sorry for any confusion that my mistake has <br />caused. The only required verification document that was not attached to the <br />application when it was submitted was the Proof of Publication from the Grand <br />Junction Daily Sentinel for the required legal notice. The Proof of Publication is <br />attached to this letter. <br />Thank you for taking time to consider my responses to the questions posed in your <br />Preliminary Adequacy Review. <br />Sincerely, <br />~u4.~ x~,lo.~~ <br />Richard Johnson <br />Resource Manager <br />