Laserfiche WebLink
r1 <br />L J <br />• <br />• <br />Project: Hayden Gulch Loadout <br />Permit: C•92-081 <br />Revision: MR-15, Temporary OfOCe Trailer <br />Date: 4/4/2007 <br />By: Jcw <br /> <br />Task: Reclamation Bonding Calculation <br /> <br />Item: Description Quantity Units Unit Cost Source Total COSt <br /> DIRECT COSTS <br />1 12'x60'x10' trailer; bury on site in existing railroad loop cut 7200 CF 0.13 Means $936 <br />2 100'x3'x0.5' concrete sidewalk, bury on site 300 SF 1.49 Means $447 <br />3 Disconnect electrical power supply 5 HR 65 Electrician' $325 <br /> Subtotal Direct E1,708 <br /> INDIRECT COSTS <br />4 Overhead and ProFlt <br /> Liability Insurance: °~ of direct 2.02 $35 <br /> Pertormance Bond: % of direct 1.05 $18 <br /> Job Superintendent NA NA <br /> Profit: % of direct 10.0 $171 <br /> Subtotal O&P $223 <br /> Contract Amount (Dlrect+ O&P) $1,931 <br /> <br />5 Legal-Engineering-Protect Management <br /> Financial Warranty Processing NA NA <br /> Engineering Work and/or ConlracUBid Preparation NA NA <br /> Recamation Management: °h of contract amount 5 $85 <br /> Subtotal Indirect 5309 <br /> Total Bond Amount $2,017 <br /> <br />Notes: i) per Janet einns (CORMS), personal communication, April 3, 2007 <br /> 2) per Dave Winograski (certified MSHA electrician), personal communication, April 3, 2007 <br />MR-15 <br />Revised 04/07 <br />