Laserfiche WebLink
ADMINISTRATIVE <br />112 Regular <br />GENERAL. PCILICV: <br />• An application for a new permit or an amendment t <br />application is determined to be administratively coi <br />existing policies on what constitutes administrative <br />• Day one is always the day following the agency's dt <br />0 1f a decision date falls on a holiday or weekend, the <br />• Complex or controversial applications always requ <br />your supervisor. If the dates change, they must be <br />Every party to a hearing before the MLRB require <br />writing to waive their right to the 30 day notice. TI <br />amendment application hearings. <br />CLARIF-CA'TION OF DECISION AND HEARING IJ <br />• Counting of the 20-day public comment period begins <br />DEADLINES <br />Applications <br />an existing permit is no[ considered received until the <br />rlete by an authorized DMG representative. (See <br />ion that the applicatior, i~ administratively complete. <br />tt business day is the decision date. <br />that the decision and hearing dates be verified by <br />minimum 30 days notice, unless all parties agree in <br />notice requirement includes parties to permit and <br />day following the date of the last publication. <br />The Division's decision can oceur no sooner than the ~ 1" day from the end public comment period. Day one is the <br />day after the 20°i day of the public comment period. <br />comment period ends on a weekend or holiday, the <br />comment period must be extended to the next busines$ day. <br />• The Division must consider d:e application by the 90~ day following the date the application was considered <br />received. The Board must consider the application by the I20's day following the date the application was <br />considertxi received. The Di. ision or Board may axle d the date for consideration by sixty days from [he date of <br />the l2(1's day, but only if the application is complex, r wtforeseen cvctunstances, or significant snow cover that <br />preeents a preop. mspecuon. <br />• If an objection to the application is submitted during <br />submitted a change to the application that is conside. <br />Amendment [o the application, the Division must ex <br />45 days if the change is an amendment. In no case <br />date the revision is considered received. <br />• If the Division has not received an objection to the <br />and the applicant has submitted a change to the <br />application that is considered by the Division to be~Technical Revision (TR) or Amendment to the application, <br />the Division may extend the time period as necess to afford the Division the time it needs to adequately review <br />the revision. [n no case may the time period be <br />received <br />ied beyond 90 days from the date the revision is considered <br />• The informal conference is held after the close of <br />• The pre-hearing conference nwst be held ~ <br />date the Division makes its recommendation. <br />public continent period. <br />days prior to the Board hearing, and at least 10 days after the <br />public comment period, and where the applicant has <br />by the Division to 6e a Technical Revision (TR) or <br />d the time period at least 20 days if the change is a TR and <br />the time period be extended more than 90 days from the <br />M:1minUC S\Proj assigr2.doc <br />