Laserfiche WebLink
ig i <br />Adequacy items <br />SHB AGRA Project E92-7075 <br />Page 17 <br />The bond calculation for year 10 (the time of maximum disturbance during the life of the mine) <br />is as follows: <br />Affected Areas <br />Haul Road <br />Mined Areas <br />Waste Rock Piles <br />Topsoil Stockpiles <br />5 AC <br />75 AC <br />75 AC <br />3 AC <br />Total Disturbed <br />Volume of Material to be Moved <br />Haul Distances <br />Haul Grades <br />Seed Mixes <br />Acreage to be Seeded <br />Building Demolition <br />Fencing <br />Equipment <br />158 AC <br />3,160,00 YDS' <br />1,900 ft. maximum <br />2-3 % <br />See Tables E-1 through E-11 <br />158 <br />None* <br />22,000 ft. <br />Scaper, loader, dozer, truck <br />• *All bridges and the main haul road will be left in place after mining for access to the property. <br />COST <br />Material Movement and Placement \ I~ ; ~ <br />I r~ <br />3,160,000 YDS' $.40/yd' $1,264,000 7 ~~p~~ <br />. ~ti <br />SeedinE and Plantine ~ U~~ <br />G/~:~ 'C ` <br />Shallow SOII Grassland <br />24 Acres x $3,026/AC 72,624 <br />Shallow Soil Grassland with Pines <br />12 Acres x $3,526/AC 42,312 <br />Deep Soil Grassland <br />3 Acres x $2,962/AC 8,886 <br />Tce Slope Grassland <br />17 Acres x $3,147/AC 53,499 <br />• <br />Ln A G R A <br />Earth & Environments/Group <br />