My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46196
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:26 PM
Creation date
11/20/2007 12:39:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000113
IBM Index Class Name
Permit File
Doc Date
9/20/2001
Doc Name
CIRCES COST ESTIMATING SOFTWARE COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IOENTIEIGATION <br />Task # : 001 State :Colorado PermiUjob# : M2000-113 <br />Dale : 09/18/2001 County : Ga~eld Abbreviation :none <br />User : GRS Site :Mamm Creek Filename : M113-001 <br />Agency or organization name : DMG <br />Permit or other job action : New Appl. / <br />Task description : Backfill Pit Highwa/Is ~. y ~, ,,411j ~,,~ ~,,~' h sr-"~~1_., l,~ Sc ,~ ,}c: 04 acs t 1 <br />or.~ <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> I <br />i Utilization <br />Cost Breakdown : Ownership cost/hour $43.30 i NA <br />Operating cost/hour : $66.26 100 <br />Ripper op. cosVhour : $0.00 NA <br />Operator cost/hour : $27.99 NA <br />Total unit cosUhour : $137.56 Total fleet cosVhour : $137.56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,163 LCY factor : NA volume : 11,183 LCY <br />Source of estimated volume :Ex L <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> ' Operalorskill: 0.75 ~ (avg.J <br />Average push distance : 100 feet Material consistency : 1.20 (Cat HBJ <br />Unadjusted hourly production : 931.6 LCY/hr Dozing method : 4 1.00 (gen.) <br /> <br />Visibility: ~ <br />i <br />1.00 <br />(avg.J <br />Material consistency description : Job efficiency : ~ 0.83 ~ (lshi(t/day) <br />- <br />- <br />Loose stockpile Spoil pile : ~ - <br />0.80 -~ <br />(tnd-AJ <br /> Push gradient : L22 ~ (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 ~ (Cat HB) <br />Average site altitude : 5,320 feet Material weight : T 0.85 (Cat HB) <br />Material weight : 2, 700 Ibs/LCY <br />Weight description <br />Earth -Wet excavated <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.237 /LCY <br />' Blade type : ~ 1.00 f (S/SU/U) <br />Net correction : 0.62 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />580.95 LCY/hr <br />580.95 LCYIhr <br />19.22 Hours <br />$2, 643 <br />c <br />t ~~ ~ (i7~ <br />j,,,k oa3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.